ホーム>sumou スポーツベットとサービス>土木sumou スポーツベット>動画でみるスポーツベットの土木sumou スポーツベット:英語版

英語版 English

05:54/音声・音楽
A4CSEL for Tunnels,
an automated system for constructing mountain tunnels, is completed
Successfully achieved automation and remote operation of 6 steps in mountain tunnel construction.

02:05/音声・音楽
スポーツベット SUSTAINABLE CONCRETE
Imagine using CO2 to build our cities—and our future. There's no easy answer to how to make our world sustainable. But at Kajima, we're developing our own answers through concrete.

03:59/音声・音楽
Naruse Dam
construction Project 2022
Naruse Dam will be the largest trapezoidal CSG dam in all of Japan. This Dam will be built using the latest mechanization and automation technology.

04:26/音声・音楽
Development of
“A4CSEL for Tunnel”
The development of automated shotcreting and mucking operations.

03:37/音声・音楽
スポーツベット's goal for future tunneling Automation for tunneling by A4CSEL
Implementation of an automated system enabling a dramatic improvement in both safety and productivity.

03:00/音声・音楽
CO2-SUICOM
A concrete that absorbs CO2 - just like natural vegetation.

02:27/音声・音楽
A4CSEL in Naruse
The challenge of autonomous operation A4CSEL in the consuruction of the large Naruse Dam.

02:10/音声・音楽
スポーツベット VISION MOVIE Rewrite civil engineering in code.
A vision movie that declares civil engineering change in Kajima to build the next 100 years.

04:37/音声・音楽
JAXA and Kajima Joint Reseach The LUNAR BASE
A construction of a lunar base by “A4CSEL”.

03:03/音楽のみ
A4CSEL Koishiwaragawa Dam Project
スポーツベット's next generation construction production system “A4CSEL” at the Koishiwaragawa Dam Project.

05:51/音声・音楽
A4CSEL Seisho Test and Practice Field
FUTURE FIELDS Toward the Future of Construction and Production Seisho Test and Practice Field.

02:35/音声・音楽
VERSATILE BOX Method① VERSATILE BOX Method

01:41/音声・音楽
VERSATILE BOX Method② EX-MAC Method

01:50/音声・音楽
VERSATILE BOX Method③ Aporo-Cutter Method

02:00/音声・音楽
VERSATILE BOX Method④ R-SWING Method